The provided documentation details installation guidelines for Oasis end drain shower bases, specifically models SB-6030R/L, SB-6032R/L, SP-SB-7v2R/L, SP-MB-6R/L, SP-60R/L, SP-60R, SP-60L, SP-MB-6R, and SP-MB-6L. These guidelines emphasize the importance of thorough inspection upon receipt, proper site framing, and adherence to all applicable installation codes. The documentation stresses that modifications beyond normal installation procedures may void warranties. All dimensional figures are for reference only, and installers should take critical measurements directly from the product itself.
Initial Inspection Procedures
Upon receiving an Oasis shower base, a comprehensive inspection is recommended before commencing installation. The documentation outlines several key checks to ensure the product meets expectations and to identify any potential issues early in the process. These checks include:
- Verifying the drain position matches the existing bathroom drain location.
- Inspecting the unit for any surface damage incurred during shipping or handling.
- Confirming the color of the shower base coordinates with other bathroom fixtures.
- Checking for the presence of any specified optional items or packages that were ordered with the product.
The documentation explicitly states that any questions or problems encountered during the inspection process should be immediately reported to the supplier. It is crucial not to begin installation until all concerns are addressed. The documentation emphasizes, “DO NOT INSTALL PRODUCT WITHOUT FIRST ADDRESSING QUESTIONS WHICH ARISE DURING THE INSPECTION!”
Installation Site Framing Requirements
Proper framing is critical for a successful and stable shower base installation. The documentation specifies that both the floor and all framing must be square and level. Framing materials and construction techniques must adhere to all applicable local building codes.
The documentation notes that pre-constructed walls may require modification to accommodate factory-applied pipes and/or fittings that protrude from the shower base unit. The recommended framing and dimensional requirements are intended for traditional applications but may need to be adjusted based on specific site conditions.
Dimensional diagrams provided with the product are for reference only. Installers are instructed to take any critical dimensions directly from the product being installed, rather than relying solely on the diagrams. The surface to which the unit will be attached – whether bare studding, drywall, or another suitable underlayment material – must be properly prepared to ensure a secure and level installation.
Warranty Considerations and Modifications
The documentation contains a strong warning regarding product modifications. Any independent modifications made to the shower base or its accessories, beyond those required for normal installation, can void all applicable warranties. Users are advised to refer to the warranty documentation for complete details regarding coverage and limitations.
The documentation also emphasizes the installer’s responsibility for ensuring compliance with all installation code requirements. All paperwork packaged with the product should be saved and provided to the homeowner upon completion of the installation.
Model-Specific References
The documentation references several specific model numbers:
- SB-6030R/L: These models are explicitly mentioned as examples throughout the guidelines.
- SB-6032R/L: Similar to the SB-6030 series, these models are covered by the same installation recommendations.
- SP-SB-7v2R/L: These models are also included within the scope of the provided guidelines.
- SP-MB-6R/L: These models are referenced in the context of inspection and framing requirements.
- SP-60R/L, SP-60R, SP-60L: These models are listed as part of the product range covered by the documentation.
- SP-MB-6R, SP-MB-6L: These models are also referenced in the context of inspection and framing requirements.
The documentation includes a note stating that all illustrations are typical and may differ from the actual product. Optional items may also be shown that were not included in the specific order.
Installer Responsibilities
The documentation clearly defines the installer’s responsibilities, emphasizing the importance of careful attention to detail and adherence to best practices. Key responsibilities include:
- Thoroughly reviewing the installation procedures before starting.
- Carefully checking the unit upon receipt for any damage or discrepancies.
- Ensuring the installation site is properly framed and leveled.
- Complying with all applicable building codes and regulations.
- Avoiding any unauthorized modifications to the product.
- Providing the homeowner with all relevant documentation upon completion of the installation.
- Addressing any questions or concerns that arise during the inspection or installation process.
The documentation states, “It is the sole responsibility of the installer directly from the product being installed!” This reinforces the need for installers to verify all critical dimensions and specifications directly on the physical product.
Conclusion
The provided documentation offers essential guidelines for the proper installation of Oasis end drain shower bases, models SB-6030R/L and SB-6032R/L, along with related models. The key takeaways emphasize the importance of pre-installation inspection, accurate site preparation, adherence to building codes, and careful attention to warranty considerations. Installers are strongly advised to prioritize these guidelines to ensure a successful, compliant, and long-lasting installation. The documentation repeatedly stresses the need to verify all critical measurements directly from the product itself and to address any questions or concerns before proceeding with the installation.

