Setting up an above-ground pool requires careful planning, attention to detail, and adherence to the manufacturer's instructions. This guide provides a step-by-step walkthrough of the installation process for the Coleman 22' x 52" and the Coleman 16' x 10' x 42" Power Steel pools, both of which are designed for durability, user-friendliness, and long-term enjoyment. Alongside the installation process, key maintenance and winterization steps are outlined to ensure your pool remains in optimal condition year after year.
Overview of the Coleman Pool Models
The Coleman Power Steel series includes two primary above-ground pool models: the 22' x 52" round model and the 16' x 10' x 42" rectangular model. Both are designed with user-friendly features such as ClickConnect™ joints, rust-resistant frames, and enhanced Tritech® liners that offer superior durability. The 22' x 52" model is ideal for larger backyards and family gatherings, while the 16' x 10' x 42" is a more compact option suited for smaller spaces.
Each model comes with essential accessories such as a filter pump, pool ladder, ground cloth, and debris cover. The 22' x 52" model holds approximately 10,668 gallons of water when filled to 90%, while the 16' x 10' x 42" model holds about 2,893 gallons under the same conditions. These specifications are critical to consider when planning the installation and long-term maintenance of the pool.
Choosing the Right Location for Installation
The success of the installation begins with selecting an appropriate location. According to the manufacturer's instructions, the pool should be installed on a level surface free from rocks, roots, or other debris that could puncture the liner or compromise the structural integrity of the pool. A stable, flat foundation is essential to prevent shifting or uneven settling.
Before setting up the pool, lay down the included ground cloth, which serves as a protective layer between the liner and the ground. This step is crucial to prevent punctures and extend the lifespan of the liner.
Assembling the Pool Frame
The frame assembly is a critical step in the installation process and must be done carefully to ensure stability and longevity. Both the 22' x 52" and 16' x 10' x 42" models use a Power Steel frame with ClickConnect™ joints, which allow for tool-free assembly. These joints are designed to prevent metal-on-metal contact, reducing the risk of rust and corrosion.
When assembling the frame, it is recommended to work with at least one or two additional people, especially for the larger 22' model. All connections should be securely fastened, and the frame should be checked for any misalignments or gaps. A properly assembled frame ensures that the pool maintains its shape and supports the weight of the water and users.
For the 22' x 52" model, the setup process typically takes 2 to 4 hours, depending on the number of people involved and their level of experience. The 16' x 10' x 42" model is slightly quicker to assemble due to its smaller size.
Installing the Liner
After the frame is assembled, the next step is to install the Tritech® liner. The liner should be unrolled and carefully placed within the frame. It is important to smooth out any wrinkles or folds to prevent future issues with the water and structural support.
For both models, the liner is made of a 3-layer reinforced material that is more tear-resistant, stretch-resistant, and puncture-resistant than standard PVC. The enhanced durability of the Tritech® liner ensures that the pool can withstand regular use and exposure to the elements.
Once the liner is in place, it should be inspected for any visible damage or imperfections. If any issues are found, the liner should not be used, as this could lead to leaks or other complications later on.
Filling the Pool
With the frame and liner in place, the next step is to fill the pool with water. It is recommended to fill the pool to approximately 90% of its total capacity to allow for expansion and settling. As the water is added, the liner should be monitored to ensure it is settling evenly and that there are no air pockets or uneven sections.
For the 22' x 52" model, this means filling the pool with around 10,668 gallons of water. The 16' x 10' x 42" model requires approximately 2,893 gallons. The time required to fill the pool will depend on the water pressure and flow rate of the hose used.
During the filling process, it is also a good idea to begin testing the filter pump system. This allows the pump to start circulating the water while the pool is still filling, helping to maintain water clarity and reduce the risk of algae growth.
Setting Up the Filter Pump System
Each Coleman Power Steel pool includes a filter pump system, typically a 1,500 GPH cartridge filter pump. This system plays a vital role in keeping the water clean and safe for use. The pump should be connected to a power source and properly positioned near the pool.
The filter pump works by drawing water from the pool, passing it through the filter cartridge to remove debris and impurities, and then returning the clean water back into the pool. It is important to follow the manufacturer's instructions for setting up the pump and to regularly maintain the filter cartridge.
The filter cartridge should be rinsed or replaced as recommended by the manufacturer. A clean filter ensures that the pump operates efficiently and that the water remains clear and free from contaminants.
Establishing a Regular Maintenance Routine
Once the pool is filled and the filter pump is operational, a regular maintenance routine should be established. This helps to ensure that the pool remains in excellent condition and that the water stays clean and safe for use.
Key maintenance tasks include: - Daily skimming to remove floating debris such as leaves, insects, and dirt. - Weekly brushing of the pool walls and floor to prevent algae buildup. - Vacuuming as needed to remove debris from the bottom of the pool. - Testing and balancing the water chemistry using test strips to monitor pH, chlorine, and alkalinity levels. - Cleaning or replacing the filter cartridge according to the manufacturer's recommendations.
By staying on top of these tasks, pool owners can minimize the risk of waterborne illnesses and maintain a clean, inviting environment for swimming and relaxation.
Winterizing the Pool
As the weather begins to cool and the swimming season comes to an end, it is important to winterize the pool to protect it from damage and ensure it is ready for use the following summer.
The winterization process includes the following steps: - Cleaning the pool thoroughly to remove any remaining debris and contaminants. - Balancing the water chemistry to prevent corrosion and algae growth during the off-season. - Lowering the water level below the skimmer to reduce the risk of damage from freezing water. - Draining and cleaning the pump and filter system to remove trapped water and prevent rusting. - Removing and storing the ladder and other accessories in a dry, protected location. - Covering the pool with a winter cover to protect it from rain, snow, and debris.
Following these steps helps to preserve the pool's structural integrity and extend its lifespan, ensuring it is ready for use when the next swimming season begins.
Additional Considerations
While the installation and maintenance of a Coleman Power Steel pool are relatively straightforward, there are a few additional considerations that should be kept in mind:
- Safety precautions: Always ensure that the pool is surrounded by a secure area to prevent accidents, especially if there are young children or pets in the household.
- Chemical handling: Pool chemicals should be stored in a cool, dry place and used according to the manufacturer's instructions to avoid overuse or exposure.
- Ladder placement: The included pool ladder should be positioned securely and inspected regularly for signs of wear or damage.
- Ground cloth maintenance: The ground cloth should be checked periodically for signs of wear or damage and replaced if necessary.
By following these additional guidelines, pool owners can help ensure a safe and enjoyable swimming experience for all users.
Conclusion
The Coleman Power Steel above-ground pool models offer a durable, user-friendly solution for homeowners looking to enjoy the benefits of a backyard pool without the high costs and maintenance demands of an in-ground pool. With their easy-to-assemble frames, reinforced Tritech® liners, and included filter pump systems, both the 22' x 52" and 16' x 10' x 42" models are designed for long-term use and minimal maintenance.
By following the manufacturer's installation instructions and establishing a regular maintenance routine, pool owners can ensure that their Coleman pool remains in excellent condition for many years. From setup to winterization, each step of the process is essential to maintaining the pool's performance and longevity.