Allsteel Installation Instructions: A Comprehensive Guide for Panel Systems and Accessories

For office and commercial space developers, modular panel systems from manufacturers like Allsteel provide versatile, durable, and aesthetically pleasing solutions. Proper installation of these panels and associated components is essential to ensure structural integrity, functionality, and longevity. This guide compiles key installation instructions from Allsteel’s official documentation, covering panel assembly, trim, door systems, electrical components, and overhead storage. The information is sourced directly from manuals, technical guides, and official documentation to ensure accuracy and reliability.

Panel Frame Connections

The installation of panel frames is foundational to the stability and alignment of the overall system. According to the Stride system manual, one of two stabilization methods must be employed to ensure adequate stability for freestanding wall partitions:

  • Method 1: Secure the panels to the floor or ceiling using standard anchoring methods.
  • Method 2: Use additional bracing between adjacent panels or integrate them into a larger modular framework.

Proper alignment is critical during initial setup. The installation process includes adjusting the height and positioning of the footed panels to ensure a level and secure fit. The manual specifies that footed panel adjustments are performed using specialized tools and should be carried out with care to avoid over-tightening or misalignment.

Base Raceway Cover Removal

The base raceway is an integral component that houses electrical and data lines, providing a clean and organized appearance while protecting internal wiring. When removal of the base raceway cover is necessary—such as for maintenance or reconfiguration—the manual outlines a methodical process that includes:

  • Removing any trim or coverings that are attached to the base.
  • Using a flathead screwdriver or similar tool to gently pry the cover from the panel.
  • Ensuring that all wiring is properly secured before removing the cover.

Care should be taken to avoid damaging the underlying electrical components during this process.

Footed Panel Adjustment

Footed panels are commonly used to provide height and adjustability in modular wall systems. Proper adjustment is crucial to maintaining the integrity of the entire structure. The manual recommends using a level and measuring tape to ensure even height distribution across the panel system. If adjustments are required, the following steps should be followed:

  1. Loosen the base screws using the appropriate tool.
  2. Adjust the height of the foot as needed.
  3. Retighten the screws securely and recheck the level.

Failure to adjust footed panels correctly may result in uneven surfaces or instability.

Low Profile Glass Installation

Low-profile glass is a popular choice in modern office environments due to its sleek appearance and seamless integration with panel systems. The installation process for low-profile glass, as detailed in the Stride manual, involves several key steps:

  • Preparation: Ensure that the panel frame is fully assembled and level.
  • Glass Placement: Carefully position the glass into the designated frame using lifting equipment if necessary.
  • Securing: Attach the glass using the provided mounting hardware and ensure that all edges are properly seated within the frame.
  • Trim Installation: Apply trim along the edges of the glass to secure it in place and provide a finished appearance.

Special attention should be given to ensuring that the glass is properly sealed and does not wobble or shift during or after installation.

Trim Installation

Trim components play a critical role in both the structural and aesthetic aspects of a panel system. The manual outlines the proper installation of several types of trim, including:

  • J-Trim: Used to cap raw panel edges where run-off is not a concern. It is commonly applied to the bottom, sides, and occasionally the top of windows and doors.
  • Drip Cap: Installed at the bottom of panels over doorways and windows to direct water away and prevent staining.
  • Rat Guard: Installed at the base of panels to prevent the entry of rodents and insects.
  • Eave Trim and Fascia: Used in roofing systems to cover the edges of panels and provide a finished appearance.

Each type of trim requires specific tools and techniques for proper installation. For example, J-Trim is typically secured using adhesive or screws, while drip caps are often fastened using nails or clips.

Panel Tile Installation

Panel tiles are used to enhance the appearance of modular walls and provide a customizable surface for branding or design. The installation process for panel tiles, as outlined in the Stride manual, includes the following steps:

  • Preparation: Ensure that the panel surface is clean and free of debris.
  • Tile Placement: Begin installation from one corner, working outward to ensure even alignment.
  • Securing: Use the provided mounting hardware to fasten the tiles securely to the panel.
  • Trim Application: Apply trim along the edges to complete the installation and provide a finished look.

Attention to detail is essential during this process to ensure that the tiles are properly aligned and securely fastened.

Door Panel Installation

Door panels are an essential component of modular wall systems, providing access to different areas within a space. The installation process for door panels, as detailed in the Stride manual, involves the following steps:

  • Frame Preparation: Ensure that the panel frame is fully assembled and level.
  • Panel Placement: Carefully position the door panel within the frame using lifting equipment if necessary.
  • Securing: Attach the door panel using the provided mounting hardware and ensure that all edges are properly seated within the frame.
  • Hinge and Lock Installation: Attach the hinges and locking mechanism according to the manufacturer’s specifications.

Proper installation of door panels is critical to ensuring smooth operation and long-term durability.

8-Wire Electrical Installation

Electrical installation is a key consideration in modular office environments. The 8-wire electrical installation process, as outlined in the Stride manual, includes the following steps:

  • Planning: Map out the electrical layout and determine the placement of outlets and switches.
  • Wiring: Install the 8-wire system according to the manufacturer’s specifications, ensuring that all connections are properly secured and insulated.
  • Testing: Test the electrical system to ensure that all components are functioning correctly.

All wiring should be installed in accordance with local electrical codes and regulations.

Data Terminal Installation

Data terminals are essential for connecting devices and systems within a modular office environment. The installation process for data terminals, as detailed in the Stride manual, includes the following steps:

  • Planning: Determine the placement of data terminals based on user needs and system requirements.
  • Installation: Mount the data terminal to the panel using the provided hardware.
  • Wiring: Connect the data terminal to the network according to the manufacturer’s specifications.
  • Testing: Test the data terminal to ensure that it is functioning correctly.

Proper installation of data terminals is essential to ensuring reliable connectivity and performance.

Overhead Storage Installation

Overhead storage units provide additional space for storing supplies and equipment in modular office environments. The installation process for overhead storage units, as outlined in the Stride manual, includes the following steps:

  • Panel Preparation: Ensure that the panel is fully assembled and level.
  • Unit Placement: Carefully position the overhead storage unit on the panel using lifting equipment if necessary.
  • Securing: Attach the storage unit using the provided mounting hardware and ensure that it is properly secured to the panel.
  • Testing: Test the stability of the storage unit to ensure that it is functioning correctly.

Proper installation of overhead storage units is essential to ensuring safety and functionality.

Permanent Wall Hanger Installation

Permanent wall hangers are used to mount various components, such as televisions, monitors, and other devices, to the panel system. The installation process for permanent wall hangers, as detailed in the Stride manual, includes the following steps:

  • Planning: Determine the placement of the wall hanger based on user needs and system requirements.
  • Installation: Mount the wall hanger to the panel using the provided hardware.
  • Testing: Test the wall hanger to ensure that it is functioning correctly and can support the intended load.

Proper installation of permanent wall hangers is essential to ensuring safety and functionality.

Worksurface Supports Installation

Worksurface supports are used to provide additional support for countertops and other surfaces in modular office environments. The installation process for worksurface supports, as outlined in the Stride manual, includes the following steps:

  • Planning: Determine the placement of the worksurface supports based on user needs and system requirements.
  • Installation: Mount the worksurface supports to the panel using the provided hardware.
  • Testing: Test the stability of the worksurface supports to ensure that they are functioning correctly.

Proper installation of worksurface supports is essential to ensuring safety and functionality.

Countertop Installation

Countertops are an essential component in modular office environments, providing a surface for work and storage. The installation process for countertops, as outlined in the Stride manual, includes the following steps:

  • Planning: Determine the placement of the countertop based on user needs and system requirements.
  • Installation: Mount the countertop to the panel using the provided hardware.
  • Testing: Test the stability of the countertop to ensure that it is functioning correctly.

Proper installation of countertops is essential to ensuring safety and functionality.

Conclusion

Allsteel’s panel systems and accessories are designed to provide durable, flexible, and aesthetically pleasing solutions for commercial and office environments. By following the manufacturer’s installation instructions carefully, users can ensure that their systems are installed correctly and function optimally. Whether installing panel frames, electrical components, or overhead storage, attention to detail and adherence to the provided guidelines are essential to achieving a successful installation.

Sources

  1. Stride Installation Instructions
  2. Concensys Installation Instructions
  3. Allsteel FAQ
  4. Allsteel Contract Documents